Prefabricated Packaged Skids – Apex House

Apex House, Wembley –
Prefabricated Packaged Skids

30 August 2017

Equipment Installed Within Nine Skid Modules:

  • 2No. Natural gas fired condensing boilers each with an output of 787kW
  • 1No. Combined heat and power unit delivery 70 kWel and 15kWth
  • 3No. 6000 litre thermal stores
  • 5No. Twin head heating circulating pumps
  • 1No. Dual pump LTHW pressurisation unit complete with 2 No. 1000 litre expansion vessels
  • 1No. LTHW de-gassing unit complete with a 600 litre expansion vessel
  • 2No. Plate heat exchangers each with a duty of 2100kW