Prefabricated Packaged Plantroom – Rockwood Hospital, Cardiff

Rockwood Hospital, Cardiff – Prefabricated Packaged Plantroom

11th June 2018

Equipment Installed Within Plantroom

  • 4No. Quinta Ace 160 LTHW boilers
  • 2No. LTHW Circulating Pumps
  • 1No. DHWS Pump
  • 1No. LTHW Pressurisation Unit
  • 2No. 300 Litres Expansion Vessels
  • 1No. 10 Litre Dosing Pot
  • 1No. AirĀ & Dirt Separator
  • 1No. HWS Water Heater