Prefabricated Packaged Plantroom – Sainsbury’s, Street

Sainsbury’s Store, Street, Somerset – Prefabricated Packaged Plantroom

13th October 2017

Equipment Installed Within Plantroom

  • 2No. LTHW Gas fired boilers each with an output of 169kW
  • 2No. Single head boiler shunt pumps
  • 4No. Twin head LTHW circulating pumps
  • 1No. 725 Litre hot water storage calorifier
  • 1No. Single head HWS return pump
  • 1No. LTHW Twin pump pressurisation unit complete with a 200 litre expansion vessel
  • 1 No. LTHW 6 Litre dosing pot