Prefabricated Packaged Plantroom – Sainsbury’s, Hornsey

Sainsbury’s Store, Hornsey – Prefabricated Packaged Plantroom

13th October 2017

Equipment Installed Within Plantroom

  • 1 No. LTHW Plate heat exchanger with a duty of 252kW
  • 1No. 725 Litre domestic hot water calorifier
  • 1No. LTHW Twin head circulating pump
  • 1No. CHW Twin head circulating pump
  • 2No. CHW Single head circulating pumps
  • 1No. DHWS Single head return pump
  • 1No. LTHW Twin pump pressurisation unit complete with a 100 litre expansion vessel
  • 1No. CHW Twin pump pressurisation unit complete with a 25 litre expansion vessel
  • 1No. LTHW 6 Litre dosing pot
  • 1No. CHW 6 Litre dosing pot