Prefabricated Packaged Plantroom – Sainsburys Redhill

Sainsburys Redhill – Prefabricated Packaged Plantroom

4th April 2016

Equipment Installed Within Plantroom:

  • 2 No. LTHW gas fired boiler
  • 2 No. Boiler shunt pumps single head pumps
  • 1 No. LTHW circulation twin head pump
  • 1 No. HWS circulation single head pump
  • 1 No. LTHW pressurisation unit c/w 500 litre expansion vessel
  • 1 No. 6 litre dosing pot
  • 1 No. 800 litre hot water cylinder