Prefabricated Packaged Plantroom – M&S Rushden Lakes

11 May 2017

UPDATE: Please see new photos showing the finished plantroom. UPDATE

Marks & Spencer, Rushden Lakes –
Prefabricated Packaged Plantroom

13 March 2017

Equipment Installed Within Plantroom:

  • 1No. Gas fired boiler with an output of 285kW
  • 1No. Low temperature hot water single head circulating pump
  • 1No. 250 litre unvented indirect hot water calorifier
  • 2No. Hot water service single head circulating pumps
  • 1No. Low temperature hot water plate heat exchange with a duty of 49kW
  • 1No. Vaccum degassing unit c/w a 300 litre expansion vessel
  • 1No. 65mm  air and dirt separator
  • 1No. 6 litre dosing pot