Prefabricated Packaged Plantroom – 35 Great St Helens, London

35 Great St Helens, London – Prefabricated Packaged Plantroom

4th April 2016

Equipment Installed Within Plantroom:

  • 2 No. Gas 210 Pro Natural gas fired boilers manufactured by Remeha
  • 4 No. LTHW twin head pumps c/w inverters
  • 2 No. HWS twin head pumps c/w inverters
  • 1 No. HWS single head pump
  • 1 No.¬†LTHW Pressurisation unit Wilo c/w 200 litre expansion vessel
  • 1 No. 300 litre hot water cylinder