Blog

Prefabricated Packaged Skid Modules – Clapham Park

Clapham Park, Energy Centre

28th November 2017

Equipment Installed Within three Skid Modules:

  • 5No. Gas fired module boilers
  • 15No. LTHW Single head boiler shunt pumps
  • 4No. LTHW Twin head circulating pumps
  • 2No. 5000 litre thermal stores
  • 2No. Chemical dosing units
  • 1No. LTHW pressurisation unit complete with a 100 litre vertical expansion vessel and 3No. 3000 litre vertical expansion vessels
  • 1No. Side stream filtration unit
  • 1No. Vacuum degassing unit
  • 1No. LTHW Sample cooler
  • 1No. BCWS Water softener
  • 1No. LTHW Plate heat exchanger
  • 8No. LTHW Heat energy meters
  • 5No. Gas meters

Prefabricated Packaged Plantroom – Sainsbury’s, Hornsey

Sainsbury’s Store, Hornsey – Prefabricated Packaged Plantroom

13th October 2017

Equipment Installed Within Plantroom

  • 1 No. LTHW Plate heat exchanger with a duty of 252kW
  • 1No. 725 Litre domestic hot water calorifier
  • 1No. LTHW Twin head circulating pump
  • 1No. CHW Twin head circulating pump
  • 2No. CHW Single head circulating pumps
  • 1No. DHWS Single head return pump
  • 1No. LTHW Twin pump pressurisation unit complete with a 100 litre expansion vessel
  • 1No. CHW Twin pump pressurisation unit complete with a 25 litre expansion vessel
  • 1No. LTHW 6 Litre dosing pot
  • 1No. CHW 6 Litre dosing pot

Prefabricated Packaged Plantroom – Sainsbury’s, Street

Sainsbury’s Store, Street, Somerset – Prefabricated Packaged Plantroom

13th October 2017

Equipment Installed Within Plantroom

  • 2No. LTHW Gas fired boilers each with an output of 169kW
  • 2No. Single head boiler shunt pumps
  • 4No. Twin head LTHW circulating pumps
  • 1No. 725 Litre hot water storage calorifier
  • 1No. Single head HWS return pump
  • 1No. LTHW Twin pump pressurisation unit complete with a 200 litre expansion vessel
  • 1 No. LTHW 6 Litre dosing pot

Prefabricated Packaged Skids – Tollgate Gardens

Tollgate Gardens, Kilburn

13th October 2017

Equipment Installed Within Six Skid Modules:

  • 3No. Gas fired boilers each with an output of 540kW
  • 3No. LTHW Single head boiler shunt pumps
  • 1No. Combined heat and power unit with an output of 33kWel adn 71.6 kWth
  • 2No. 4500 Litre vertical thermal stores
  • 1No. LTHW Single head CHP shunt pump
  • 2No. LTHW Twin head circulation pumps
  • 1No. Single head centrifugal pump LTHW pressurisation unit complete with a 800 litre vertical expansion vessel
  • 1No. Side stream filter unit
  • 1No. LTHW Single head side stream filter pump
  • 1No. CAT 4 break tank and booster set assembly
  • 1 No. 20,000 Litre cold water storage tank
  • 1No. Four pump cold water booster set
  • 1No. 150mm LTHW air & dirt separator
  • 1No. 35 Litre LTHWdosing pot

Prefabricated Packaged Skids – University College London

University College London –
Prefabricated Packaged Skids

30 August 2017

Equipment Installed Within Seven Skid Modules:

  • 4No. Ground source heat pumps
  • 2No. Water heaters
  • 4No. Heating plate heat exchangers
  • 1No. LTHW Trench Heating pressurisation unit complete with 2No. 200 litre expansion vessels
  • 1No. LTHW Air Handling Unit pressurisation unit complete with 1No. 1000 litre expansion vessel
  • 1No. DHWS Primary pressurisation unit complete with 1No. 12 litre expansion vessel
  • 1No. CHW Primary pressurisation unit complete with 1No. 500 litre expansion vessel
  • 1No. Heat Pump CHW pressurisation unit complete with 1No. 12 litre expansion vessel
  • 1No. Three head cold water booster set
  • 8No. CHW single head circulating pumps
  • 8No. LTHW single head circulating pumps
  • 1No. LTHW Trench Heating 80mm air & dirt separator
  • 1No. LTHW Air Handling Unit 100mm air & dirt separator
  • 1No. CHW 150mm air & dirt separator
  • 1No. HWS Primary 32mm air & dirt separator
  • 1No. 10 Litre Ground source heat pump dosing pot
  • 1No. 5 Litre LTHW Trench Heating dosing pot
  • 1No. 10 Litre LTHW Air Handling Unit dosing pot
  • 1No. 6 Litre HWS Primary dosing pot

Prefabricated Packaged Plantroom – Wellington College

Wellington College –
Prefabricated Packaged Plantroom

30 August 2017

Equipment Installed Within Plantroom:

  • 1No. Three module boiler with an output of 719.4kW
  • 1No. Combined heat and power unit delivery 50 kWel and 79kWth
  • 1No. 2000 litre thermal store
  • 3No. Single head boiler shunt pumps
  • 1No. Twin head heating circulating pump
  • 1No. Single head CHP primary pump
  • 1No. Twin head buffer vessel pump
  • 1No. Heating pressurisation unit complete with 2No. 500 litre expansion vessels
  • 1No. 11 Litre dosing pot
  • 1No. 100mm Air & dirt separator

Prefabricated Packaged Skids – Apex House

Apex House, Wembley –
Prefabricated Packaged Skids

30 August 2017

Equipment Installed Within Nine Skid Modules:

  • 2No. Natural gas fired condensing boilers each with an output of 787kW
  • 1No. Combined heat and power unit delivery 70 kWel and 15kWth
  • 3No. 6000 litre thermal stores
  • 5No. Twin head heating circulating pumps
  • 1No. Dual pump LTHW pressurisation unit complete with 2 No. 1000 litre expansion vessels
  • 1No. LTHW de-gassing unit complete with a 600 litre expansion vessel
  • 2No. Plate heat exchangers each with a duty of 2100kW

 

 

 

Prefabricated Packaged Plantroom – M&S Rushden Lakes

11 May 2017

UPDATE: Please see new photos showing the finished plantroom. UPDATE

Marks & Spencer, Rushden Lakes –
Prefabricated Packaged Plantroom

13 March 2017

Equipment Installed Within Plantroom:

  • 1No. Gas fired boiler with an output of 285kW
  • 1No. Low temperature hot water single head circulating pump
  • 1No. 250 litre unvented indirect hot water calorifier
  • 2No. Hot water service single head circulating pumps
  • 1No. Low temperature hot water plate heat exchange with a duty of 49kW
  • 1No. Vaccum degassing unit c/w a 300 litre expansion vessel
  • 1No. 65mm  air and dirt separator
  • 1No. 6 litre dosing pot

Prefabricated LTHW & CHW Packaged Plantroom – Radio House, Cambridge

11 May 2017

UPDATE: Please see new photos showing the finished plantroom. UPDATE

Radio House, Cambridge – Prefabricated Packaged Plantroom

13 March 2017

Equipment Installed Within Plantroom:

  • 1No. Gas fired boiler, made up of 3 modules with a combined output of 678.6kW
  • 4No. Low temperature hot water twin head circulating pumps
  • 2No. Chilled water single head circulating pumps
  • 1No. Chilled water twin head circulating pump
  • 1No. LTHW pressurisation unit c/w a 500 litre expansion vessel
  • 1No. CHW pressurisation unit c/w a 80 litre expansion vessel
  • 1No. DHWS single head circulating pump
  • 1No. 400 litre Water heater complete with unvented kit.
  • 1No. 100mm LTHW dirt separator
  • 1No. 6 litre LTHW dosing pot
  • 1No. 6 litre CHW dosing pot

Prefabricated LTHW & CHW Packaged Plantroom – Green Park, Reading

Green Park, Reading –
Combined LTHW & CHW Prefabricated Packaged Plantroom

31 January 2017

Equipment Installed Within Plantroom:

  • 3No. Gas fired boilers with a combined output of 1383kW
  • 2No. Chilled water single head circulating pumps
  • 4No. Chilled water twin head circulating pumps
  • 1No. LTHW combined de-gasser / pressurisation unit c/w 2No. 600 litre expansion vessel
  • 1No. CHW combined de-gasser / pressurisation unit c/w a 300 litre expansion vessel
  • 1No. 250mm LTHW dirt separator
  • 1No. 150mm CHW dirt separator
  • 1No. 80mm Heat recovery air & dirt separator
  • 1No. 10 litre LTHW dosing pot
  • 1No. 10 litre CHW dosing pot
  • 1No. 6 litre Heat recovery dosing pot

Prefabricated CWS Packaged Plantroom – Fenwick, Bracknell

31 January 2017

UPDATE: Please see new photos showing the finished plantroom. UPDATE

 

Fenwick, Bracknell –
Cold Water Services Prefabricated Packaged Plantroom

 

16 November 2016

Equipment Installed Within Plantroom:

  • 1No. 10,000 litre cold water storage tank
  • 1No. 3 head cold water booster set
  • 1No. Single head wash down booster set
  • 1No. 50mm electromagnetic water conditioner

Prefabricated CHW Packaged Plantroom – Fenwick, Bracknell

31 January 2017

UPDATE: Please see new photos showing the finished plantroom. UPDATE

 

Fenwick, Bracknell –
Chilled Water Prefabricated Packaged Plantroom

 16 November 2016

 

Equipment Installed Within Plantroom:

  • 2No. CHW twin head circulation pumps
  • 1No. CHW single head circulation pump
  • 1No. CHW pressurisation unit c/w a 200 litre expansion vessel
  • 1No. 10 litre dosing pot
  • 1No. 150mm air & dirt separator

Prefabricated LTHW & HWS Packaged Plantroom – Fenwick, Bracknell

31 January 2017

UPDATE: Please see new photos showing the finished plantroom. UPDATE

Fenwick, Bracknell –
Combined LTHW & HWS Prefabricated Packaged Plantroom

19 October 2016 

Equipment Installed Within Plantroom:

  • 2No. Gas fired boilers each with an output of 479.6kW
  • 2No. Gas fired 300 litre hot water heaters each complete with a expansion relief valve, 25 litre expansion vessel and temperature pressure relief valve
  • 3No. LTHW twin head circulation pumps
  • 1No. LTHW pressurisation unit c/w a 800 litre expansion vessel
  • 2No. Single head HWS return pumps
  • 1No. 6 litre dosing pot
  • 1No. 100mm air & dirt separator

 

 

 

Prefabricated Packaged Plantroom – Brunel University

19th October 2016

UPDATE: Please see new photos showing the installation progress of this project. UPDATE

Brunel University, Wilfred Brown Building –
Prefabricated Packaged Plantroom

08 September 2016

Equipment Installed Within Plantroom:

  • 1No. LTHW plate heat exchanger, Duty: 250kW
  • 1No. CHW plate heat exchanger, Duty: 100kW
  • 2No. LTHW twin head circulation pumps
  • 3No. CHW twin head circulation pumps
  • 1No. LTHW pressurisation unit c/w 2No. 500 litre expansion vessels
  • 1No. CHW 300 litre expansion vessel
  • 1No. LTHW 900 litre buffer vessel
  • 1No. CHW 900 litre buffer vessel
  • 1No. 3000 litre cold water storage tank
  • 1No. Three head cold water booster set
  • 1No. CHW 6 litre dosing pot

 

 

 

Prefabricated Packaged Plantroom – Heathrow Airport

Heathrow Airport, Technical Block C –
Prefabricated Packaged Plantroom

08 September 2016

Equipment Installed Within Plantroom:

  • 2No. Natural gas fired condensing boilers each with an output of 380kW
  • 1No. LTHW twin head circulation pump
  • 1No. LTHW pressurisation unit c/w 300 litre expansion vessel
  • 1No. LTHW 100mm air & dirt separator
  • 1No. LTHW 6 litre dosing pot

 

 

 

Prefabricated Packaged Plantroom – Thames Tower

Thames Tower – Prefabricated Packaged Plantroom

1st August 2016

Equipment Installed Within Plantroom:

  • 2No. 4 modules 300kw natural gas fired condensing boilers
  • 2No. Boiler shunt pumps
  • 4No. LTHW single head circulation pumps
  • 3No. CHW chiller twin head pumps
  • 4No. CHW single head circulation pumps
  • 1No. LTHW de-gasser & combined pressurisation unit c/w expansion vessels
  • 1No. CHW de-gasser & combined pressurisation unit c/w expansion vessels
  • 1No. LTHW 150mm air & dirt separator
  • 1No. CHW 250mm air & dirt separator
  • 1No. LTHW 25 litre dosing pot
  • 1No. CHW 25 litre dosing pot

 

 

 

Prefabricated Packaged Plantroom – Gatwick Diamond Building

Gatwick Diamond Building – Prefabricated Packaged Plantroom

5th April 2016


Equipment Installed Within Plantroom:

  • 2 No. LTHW gas fired boiler
  • 2 No. Free issued AHU LTHW circuit pumps
  • 2 No. Free issued LTHW HWS circuit pumps
  • 2 No. Free issued AHU CHW circuit pumps
  • 2 No. Free issued AHU CHW circuit pumps
  • 1 No. Free issued LTHW pressurisation unit c/w 800 litre expansion vessel
  • 1 No. Free issued CHW pressurisation unit c/w 100 litre expansion vessel
  • LTHW Air & dirt separator
  • CHW Air & dirt separator
  • 2 No. 10 litre dosing pot
  • 2 No. 800 litre hot water buffer vessel
  • 2 No. Plate heat exchangers

Prefabricated Packaged Plantroom – Sainsburys Redhill

Sainsburys Redhill – Prefabricated Packaged Plantroom

4th April 2016

Equipment Installed Within Plantroom:

  • 2 No. LTHW gas fired boiler
  • 2 No. Boiler shunt pumps single head pumps
  • 1 No. LTHW circulation twin head pump
  • 1 No. HWS circulation single head pump
  • 1 No. LTHW pressurisation unit c/w 500 litre expansion vessel
  • 1 No. 6 litre dosing pot
  • 1 No. 800 litre hot water cylinder

Prefabricated Packaged Plantroom – M&S Rawtenstall

M&S Rawtenstall – Prefabricated Packaged Plantroom

4th April 2016

Equipment Installed Within Plantroom:

  • 1 No. LTHW condensing boiler
  • 1 No. LTHW single head pump
  • 1 No. HWS single head pump
  • 1 No. LTHW de-gasser & combined pressurisation unit c/w 200 lite expansion vessel
  • 1 No. 300 litre hot water cylinder
  • 1 No. Air & dirt separator
  • 1 No. 6 litre dosing pot

Prefabricated Packaged Plantroom – 35 Great St Helens, London

35 Great St Helens, London – Prefabricated Packaged Plantroom

4th April 2016

Equipment Installed Within Plantroom:

  • 2 No. Gas 210 Pro Natural gas fired boilers manufactured by Remeha
  • 4 No. LTHW twin head pumps c/w inverters
  • 2 No. HWS twin head pumps c/w inverters
  • 1 No. HWS single head pump
  • 1 No. LTHW Pressurisation unit Wilo c/w 200 litre expansion vessel
  • 1 No. 300 litre hot water cylinder

Prefabricated Packaged Plantroom – Waitrose, High Wycombe

Prefabricated Packaged Plantroom – Waitrose, High Wycombe

24th February 2016

Equipment Installed Within Plantroom:

  • 2no. LTHW boiler natural gas 210-200
  • 2no. Boiler single head shunt pumps IL 32/150-0.27/4
  • 1no. LTHW secondary pump DL 40/210-1.1/4
  • 1no. HWS circulation pump Top-Z 40/7
  • 2no. Chilled single head pumps IP-E 50/150-4/2
  • 2no. Chilled single head pumps IPL 40/120-1.5/2
  • 1no. Pressurisation unit and expansion vessel EFD 500
  • 1no. Pressurisation unit and expansion vessel EFD 80
  • 2no. 10 litre dosing pot
  • 1no. Hot water heater EC230/960
  • 1no. HWS water conditioner SCA42CC
  • 3no. Air & Dirt Separators

Prefabricated Packaged Plantroom – Kent Science Park

Kent Science Park – Prefabricated Packaged Plantroom

29th January 2016

Equipment Installed Within Plantroom:

  • 2 No. Air Compressors
  • 2 No. Air Dryer
  • 1 No. Air Receiver
  • Control Panel
  • Small Power & Lighting