Prefabricated Packaged Plant Room- Embassy Gardens,

Embassy Gardens – Prefabricated Packaged Plantroom

31st July 2018

 

  • 2No Circulation pumps
  • 1No CHW Pressurisation unit
  • 1No Expansion vessel
  • 1No Dosing pot
  • 1No De-aerator
  • 100-200mm Diameter chilled water pipe services

Prefabricated Packaged Plantroom – Rockwood Hospital, Cardiff

Rockwood Hospital, Cardiff – Prefabricated Packaged Plantroom

11th June 2018

Equipment Installed Within Plantroom

  • 4No. Quinta Ace 160 LTHW boilers
  • 2No. LTHW Circulating Pumps
  • 1No. DHWS Pump
  • 1No. LTHW Pressurisation Unit
  • 2No. 300 Litres Expansion Vessels
  • 1No. 10 Litre Dosing Pot
  • 1No. Air & Dirt Separator
  • 1No. HWS Water Heater

 

Prefabricated Packaged Skid Modules – Clapham Park

Clapham Park, Energy Centre

28th November 2017

Equipment Installed Within three Skid Modules:

  • 5No. Gas fired module boilers
  • 15No. LTHW Single head boiler shunt pumps
  • 4No. LTHW Twin head circulating pumps
  • 2No. 5000 litre thermal stores
  • 2No. Chemical dosing units
  • 1No. LTHW pressurisation unit complete with a 100 litre vertical expansion vessel and 3No. 3000 litre vertical expansion vessels
  • 1No. Side stream filtration unit
  • 1No. Vacuum degassing unit
  • 1No. LTHW Sample cooler
  • 1No. BCWS Water softener
  • 1No. LTHW Plate heat exchanger
  • 8No. LTHW Heat energy meters
  • 5No. Gas meters

Prefabricated Packaged Plantroom – Sainsbury’s, Hornsey

Sainsbury’s Store, Hornsey – Prefabricated Packaged Plantroom

13th October 2017

Equipment Installed Within Plantroom

  • 1 No. LTHW Plate heat exchanger with a duty of 252kW
  • 1No. 725 Litre domestic hot water calorifier
  • 1No. LTHW Twin head circulating pump
  • 1No. CHW Twin head circulating pump
  • 2No. CHW Single head circulating pumps
  • 1No. DHWS Single head return pump
  • 1No. LTHW Twin pump pressurisation unit complete with a 100 litre expansion vessel
  • 1No. CHW Twin pump pressurisation unit complete with a 25 litre expansion vessel
  • 1No. LTHW 6 Litre dosing pot
  • 1No. CHW 6 Litre dosing pot

Prefabricated Packaged Plantroom – Sainsbury’s, Street

Sainsbury’s Store, Street, Somerset – Prefabricated Packaged Plantroom

13th October 2017

Equipment Installed Within Plantroom

  • 2No. LTHW Gas fired boilers each with an output of 169kW
  • 2No. Single head boiler shunt pumps
  • 4No. Twin head LTHW circulating pumps
  • 1No. 725 Litre hot water storage calorifier
  • 1No. Single head HWS return pump
  • 1No. LTHW Twin pump pressurisation unit complete with a 200 litre expansion vessel
  • 1 No. LTHW 6 Litre dosing pot

Prefabricated Packaged Skids – Tollgate Gardens

Tollgate Gardens, Kilburn

13th October 2017

Equipment Installed Within Six Skid Modules:

  • 3No. Gas fired boilers each with an output of 540kW
  • 3No. LTHW Single head boiler shunt pumps
  • 1No. Combined heat and power unit with an output of 33kWel adn 71.6 kWth
  • 2No. 4500 Litre vertical thermal stores
  • 1No. LTHW Single head CHP shunt pump
  • 2No. LTHW Twin head circulation pumps
  • 1No. Single head centrifugal pump LTHW pressurisation unit complete with a 800 litre vertical expansion vessel
  • 1No. Side stream filter unit
  • 1No. LTHW Single head side stream filter pump
  • 1No. CAT 4 break tank and booster set assembly
  • 1 No. 20,000 Litre cold water storage tank
  • 1No. Four pump cold water booster set
  • 1No. 150mm LTHW air & dirt separator
  • 1No. 35 Litre LTHWdosing pot

Prefabricated Packaged Skids – University College London

University College London –
Prefabricated Packaged Skids

30 August 2017

Equipment Installed Within Seven Skid Modules:

  • 4No. Ground source heat pumps
  • 2No. Water heaters
  • 4No. Heating plate heat exchangers
  • 1No. LTHW Trench Heating pressurisation unit complete with 2No. 200 litre expansion vessels
  • 1No. LTHW Air Handling Unit pressurisation unit complete with 1No. 1000 litre expansion vessel
  • 1No. DHWS Primary pressurisation unit complete with 1No. 12 litre expansion vessel
  • 1No. CHW Primary pressurisation unit complete with 1No. 500 litre expansion vessel
  • 1No. Heat Pump CHW pressurisation unit complete with 1No. 12 litre expansion vessel
  • 1No. Three head cold water booster set
  • 8No. CHW single head circulating pumps
  • 8No. LTHW single head circulating pumps
  • 1No. LTHW Trench Heating 80mm air & dirt separator
  • 1No. LTHW Air Handling Unit 100mm air & dirt separator
  • 1No. CHW 150mm air & dirt separator
  • 1No. HWS Primary 32mm air & dirt separator
  • 1No. 10 Litre Ground source heat pump dosing pot
  • 1No. 5 Litre LTHW Trench Heating dosing pot
  • 1No. 10 Litre LTHW Air Handling Unit dosing pot
  • 1No. 6 Litre HWS Primary dosing pot

Prefabricated Packaged Plantroom – Wellington College

Wellington College –
Prefabricated Packaged Plantroom

30 August 2017

Equipment Installed Within Plantroom:

  • 1No. Three module boiler with an output of 719.4kW
  • 1No. Combined heat and power unit delivery 50 kWel and 79kWth
  • 1No. 2000 litre thermal store
  • 3No. Single head boiler shunt pumps
  • 1No. Twin head heating circulating pump
  • 1No. Single head CHP primary pump
  • 1No. Twin head buffer vessel pump
  • 1No. Heating pressurisation unit complete with 2No. 500 litre expansion vessels
  • 1No. 11 Litre dosing pot
  • 1No. 100mm Air & dirt separator

Prefabricated Packaged Skids – Apex House

Apex House, Wembley –
Prefabricated Packaged Skids

30 August 2017

Equipment Installed Within Nine Skid Modules:

  • 2No. Natural gas fired condensing boilers each with an output of 787kW
  • 1No. Combined heat and power unit delivery 70 kWel and 15kWth
  • 3No. 6000 litre thermal stores
  • 5No. Twin head heating circulating pumps
  • 1No. Dual pump LTHW pressurisation unit complete with 2 No. 1000 litre expansion vessels
  • 1No. LTHW de-gassing unit complete with a 600 litre expansion vessel
  • 2No. Plate heat exchangers each with a duty of 2100kW

 

 

 

Prefabricated Packaged Plantroom – M&S Rushden Lakes

11 May 2017

UPDATE: Please see new photos showing the finished plantroom. UPDATE

Marks & Spencer, Rushden Lakes –
Prefabricated Packaged Plantroom

13 March 2017

Equipment Installed Within Plantroom:

  • 1No. Gas fired boiler with an output of 285kW
  • 1No. Low temperature hot water single head circulating pump
  • 1No. 250 litre unvented indirect hot water calorifier
  • 2No. Hot water service single head circulating pumps
  • 1No. Low temperature hot water plate heat exchange with a duty of 49kW
  • 1No. Vaccum degassing unit c/w a 300 litre expansion vessel
  • 1No. 65mm  air and dirt separator
  • 1No. 6 litre dosing pot