December 2017

Prefabricated Packaged Skid Modules – Clapham Park

Clapham Park, Energy Centre

28th November 2017

Equipment Installed Within three Skid Modules:

  • 5No. Gas fired module boilers
  • 15No. LTHW Single head boiler shunt pumps
  • 4No. LTHW Twin head circulating pumps
  • 2No. 5000 litre thermal stores
  • 2No. Chemical dosing units
  • 1No. LTHW pressurisation unit complete with a 100 litre vertical expansion vessel and 3No. 3000 litre vertical expansion vessels
  • 1No. Side stream filtration unit
  • 1No. Vacuum degassing unit
  • 1No. LTHW Sample cooler
  • 1No. BCWS Water softener
  • 1No. LTHW Plate heat exchanger
  • 8No. LTHW Heat energy meters
  • 5No. Gas meters

Prefabricated Packaged Plantroom – Sainsbury’s, Hornsey

Sainsbury’s Store, Hornsey – Prefabricated Packaged Plantroom

13th October 2017

Equipment Installed Within Plantroom

  • 1 No. LTHW Plate heat exchanger with a duty of 252kW
  • 1No. 725 Litre domestic hot water calorifier
  • 1No. LTHW Twin head circulating pump
  • 1No. CHW Twin head circulating pump
  • 2No. CHW Single head circulating pumps
  • 1No. DHWS Single head return pump
  • 1No. LTHW Twin pump pressurisation unit complete with a 100 litre expansion vessel
  • 1No. CHW Twin pump pressurisation unit complete with a 25 litre expansion vessel
  • 1No. LTHW 6 Litre dosing pot
  • 1No. CHW 6 Litre dosing pot