Prefabricated LTHW & CHW Packaged Plantroom – Green Park, Reading

Green Park, Reading –
Combined LTHW & CHW Prefabricated Packaged Plantroom

31 January 2017

Equipment Installed Within Plantroom:

  • 3No. Gas fired boilers with a combined output of 1383kW
  • 2No. Chilled water single head circulating pumps
  • 4No. Chilled water twin head circulating pumps
  • 1No. LTHW combined de-gasser / pressurisation unit c/w 2No. 600 litre expansion vessel
  • 1No. CHW combined de-gasser / pressurisation unit c/w a 300 litre expansion vessel
  • 1No. 250mm LTHW dirt separator
  • 1No. 150mm CHW dirt separator
  • 1No. 80mm Heat recovery air & dirt separator
  • 1No. 10 litre LTHW dosing pot
  • 1No. 10 litre CHW dosing pot
  • 1No. 6 litre Heat recovery dosing pot